- Future Southeast Asia
- Posts
- Penang's LRT connecting Georgetown to the airport and train station
Penang's LRT connecting Georgetown to the airport and train station
News #248: Phnom Penh walking street, Philippines to focus on 16 major infra projects, Lao Cai-Hanoi-Hai Phong railway project set for 2031 completion
The Future Southeast Asia Newsletter features transport and urban development news in Southeast Asia, edited by James Clark.
This week’s feature article is about the under-construction Penang LRT. This is an update of an older article when the LRT was known as the Bayan Lepas LRT.
The original plan was for the LRT to connect the historic Georgetown area with the airport. The LRT now includes a link to the future reclaimed island to the south and a rail bridge to the mainland.
The rail bridge will need to be high enough to allow ships to pass through the Penang Strait, so this is going to be an iconic sight. Passengers coming from KL to Butterworth by train will transfer to the LRT and will have a spectacular transit ride across the strait.
The Penang LRT will be the first transit line in Malaysia outside of the Klang Valley (Greater KL). The RTS Link between Johor Bahru and Singapore is being built, but this is a cross-border shuttle with 2 stations. Should this be counted as a transit line?
Either way, Penang will join a rare group of non-capital cities in Southeast Asia that have a transit line of some sort. There is Palembang in Indonesia, and Ho Chi Minh City is now the second city in Vietnam to have a transit line after Hanoi Capital. I thought Thailand would have been quicker to build a line beyond Bangkok, but transit projects in Phuket, Chiang Mai, and Khon Kaen have been put off for years.
Latest posts at Future Southeast Asia
The Mutiara LRT Line is an under-construction light rail transit (LRT) system in Penang. The line will run along the east coast of Penang Island from Georgetown to Silicon Island, and from Georgetown to Penang Sentral on the mainland via a bridge across the Penang Strait.
Phnom Penh's future architectural marvel, Indonesia opens 2 new airports but demotes 17 international airports, a new airport in Laos, Manila's multiple airport projects, Bangkok plans for 200 million pax p.a, Ho Chi Minh City's 2 airport projects, and more new airport proposals in Vietnam.
Support Future Southeast Asia News!
Become a paid subscriber and support Future Southeast Asia News.
It’s $5 a month or $50 a year, and your subscription will help keep this site running. Hit the upgrade button to subscribe.
News
🇰🇭 Cambodia
"A pedestrian-only zone will be operational along the riverside from Friday to Sunday, as part of wider plans to transform the area into an attractive tourist destination."
🇮🇩 Indonesia
• Unraveling the physics behind severe flash floods in Indonesia's new capital on March 15-16, 2022 (News Release 7-Jan-2025)
"Experts warn the new economic zone will be a ‘serious threat’ that could exacerbate Indonesia’s struggles to attract top-tier investments."
🇱🇦 Laos
🇲🇾 Malaysia
“Critics warn the RM7.5bil highway could cannibalise ridership of the proposed LRT system.”
🇵🇭 Philippines
"The 16 flagship projects include the North-South Commuter Railway, the Metro Manila Subway Project, the Metro Rail Transit (MRT) Line 4, MRT Line 7, Light Rail Transit Line 1 Extension, the New Cebu International Container Port, the Philippine National Railways South Long Haul, Mindanao Railway, and the New Dumaguete Airport."
“The Light Rail Transit Authority (LRTA) has secured P2 billion to deliver the preliminary works for a project that would extend the Light Rail Transit Line 2 (LRT-2) to the western segment of Manila.”
"Metro Manila’s road congestion woes can be solved. But they have been hampered by slow implementation and weak political will."
🇸🇬 Singapore
🇹🇭 Thailand
🇹🇱 Timor-Leste
🇻🇳 Vietnam
“The railway will start from Lao Cai Province, near the Chinese border, to Lach Huyen Port in Hai Phong City, passing through nine provinces and cities, including Hanoi.”
“Metro Line 2 (Ben Thanh – Tham Luong) in Ho Chi Minh City has 99% of the site cleared, but construction cannot begin in 2025 because the budget has not been allocated and there are problems related to the unit prices of the bid packages.”
Leave a like or comment
Thanks for reading the Future Southeast Asia Newsletter. Feel free to leave a like or comment on the topics of this week’s news.
Reply